Statistical process control (SPC) is a method of quality control which uses statistical methods. SPC is applied in order to monitor and control a process. Monitoring and controlling the process ensures that it operates at its full potential. At its full potential, the process can make as much conforming product as possible with a minimum (if not an elimination) of waste (rework or trash). SPC can be applied to any process where the "conforming product" (product meeting specifications) output can be measured. Key tools used in SPC include control charts; a focus on continuous improvement; and the design of experiments. An example of a process where SPC is applied is manufacturing lines.
Contents |
SPC must be practiced in 2-phases, where in first phase of SPC to establish the process initially and after that in second phase during the production run. In the second phase, we need to decide the period to be examined, depending upon the change in 4-M conditions and wear rate of parts used in the manufacturing process (machine parts, Jigs and fixture and tooling standard).
An advantage of SPC over other methods of quality control, such as "inspection", is that it emphasizes early detection and prevention of problems, rather than the correction of problems after they have occurred.
In addition to reducing waste, SPC can lead to a reduction in the time required to produce the product. SPC makes it less likely the finished product will need to be reworked. SPC may also identify bottlenecks, waiting times, and other sources of delays within the process.
SPC is applied to reduce or eliminate process waste. This, in turn, eliminates the need for the process step of post-manufacture inspection. The success of SPC relies not only on the skill with which it is applied, but also on how suitable or amenable the process is to SPC. In some cases, it may be difficult to judge when the application of SPC is appropriate.[citation needed]
SPC was pioneered by Walter A. Shewhart at Bell Laboratories in the early 1920s. Shewhart developed the control chart in 1924 and the concept of a state of statistical control. Along with a gifted team at AT&T that included Harold Dodge and Harry Romig he worked to put sampling inspection on a rational statistical basis as well. Shewhart consulted with Colonel Leslie E. Simon in the application of control charts to munitions manufacture at the Army's Picatinney Arsenal in 1934. That successful application helped convince Army Ordnance to engage AT&T's George Edwards to consult on the use of statistical quality control among its divisions and contractors at the outbreak of World War II. W. Edwards Deming invited Shewhart to speak at the Graduate School of the U.S. Department of Agriculture, and served as the editor of Shewhart's book Statistical Method from the Viewpoint of Quality Control (1939) which was the result of that lecture. Deming was an important architect of the quality control short courses that trained American industry in the new techniques during WWII. The graduates of these wartime courses formed a new professional society in 1945, the American Society for Quality Control, which elected Edwards as its first president. Deming traveled to Japan during the Allied Occupation and met with the Union of Japanese Scientists and Engineers(JUSE)in an effort to introduce SPC methods to Japanese industry .[1][2]
Shewhart read the new statistical theories coming out of Britain, especially the work of "Student", Karl Pearson, and R. A. Fisher. However, he understood that data from physical processes seldom produced a "normal distribution curve"; that is, a Gaussian distribution or "bell curve". He discovered that data from measurements of variation in manufacturing did not always behave the way as data from measurements of natural phenomena (for example, Brownian motion of particles). Shewhart concluded that while every process displays variation, some processes display variation that is controlled and natural to the process ("common" sources of variation). Other processes display variation that is not controlled and that is not present in the causal system of the process at all times ("special" sources of variation).[3]
In 1988, the Software Engineering Institute suggested that SPC could be applied to non-manufacturing processes, such as software engineering processes, in the Capability Maturity Model (CMM). The Level 4 and Level 5 practices of the Capability Maturity Model Integration (CMMI) use this concept. The notion that SPC is a useful tool when applied to non-repetitive, knowledge-intensive processes such as engineering has encountered skepticism and remains controversial.[4][5]
In mass-manufacturing, traditionally, the quality of a finished article is ensured by post-manufacturing inspection of the product. Each article (or a sample of articles from a production lot) may be accepted or rejected according to how well it meets its design specifications. In contrast, SPC uses statistical tools to observe the performance of the production process in order to predict significant variations which may result in the production of a sub-standard article. A sources of variation at any one point of a production process will fall into one of two classes.
Most processes have many sources of variation; most of them are minor and may be ignored. If the dominant sources of variation are identified, however, resources for change can be focused on them. If the dominant assignable sources of variation can be detected, potentially they can be identified and removed. Once removed, the process is said to be "stable". When a process is stable, its variation should remain within a known set of limits. That is, at least, until another assignable source of variation is introduced. For example, a breakfast cereal packaging line may be designed to fill each cereal box with 500 grams of cereal. Some boxes will have slightly more than 500 grams, and some will have slightly less. When package weight is measured, the data will demonstrate a distribution of net weights. If the production process, its inputs, or its environment (for example, the machines on the line) change, the distribution of the data will change. For example, as the cams and pulleys of the machinery wear, the cereal filling machine may put more than the specified amount of cereal into each box. Although this might benefit the customer, from the manufacturer's point of view, this is wasteful and increases the cost of production. If the manufacturer finds the change and its source in a timely manner, the change can be corrected (for example, the cams and pulleys replaced).
The application of SPC involves three main sets of activities:
1. The first is understanding of the process. This is achieved by business process mapping. 2. The second is measuring the sources of variation assisted by the use of control charts and 3. The third is eliminating assignable (special) sources of variation.
The data from measurements of variations at points on the process map is monitored using control charts. Control charts can differentiate "assignable" ("special") sources of variation from "common" sources. "Common" sources, because they are an expected part of the process, are of much less concern to the manufacturer than "assignable" sources. Using control charts is a continuous activity, ongoing over time.
When the process does not trigger any of the control chart "detection rules" for the control chart, it is said to be "stable". A process capability analysis may be performed on a stable process to predict the ability of the process to produce "conforming product" in the future.
When the process triggers any of the control chart "detection rules", (or alternatively, the process capability is low), other activities may be performed to identify the source of the excessive variation. The tools used in these extra activities include: Ishikawa diagrams, designed experiments, and Pareto charts. Designed experiments are critical to this phase of the application of SPC. They are the only means of objectively quantifying the relative importance (strength) of sources of variation. Once the sources of variation have been quantified, those sources that are both statistically and practically significant can be eliminated. (A source that is statistically significant may not be considered cost effective to eliminate. A source that is not statistically significant would not be considered significant in practical terms). Methods of eliminating a source of variation might include: development of standards; staff training; error-proofing and changes to the process itself.
Digital control charts use logic based rules that determine "derived values" which signal the need for correction. For example,
| Wikimedia Commons has media related to: Statistical process control |
From kevin dooley
From Ken Lund
From JustCallM...
From jurvetson
From Julian...
From examplecg
From Ignotus...
From ario_
From Global...
From Global...
Here you can share your comments or contribute with more information, content, resources or links about this topic.