1
Light Our World: Zimbabwe
Light Our World: Zimbabwe's Electricity Supply Authority
DATE: 2013/07/01::
2
Power Cuts in Zimbabwe by ZESA
Power Cuts in Zimbabwe by ZESA
DATE: 2015/04/04::
3
Byo Residents demostrate against ZESA
Byo Residents demostrate against ZESA
DATE: 2011/11/02::
4
Why Africa is known as the DARK continent
Why Africa is known as the DARK continent
DATE: 2015/01/08::
5
Bulawayo:  Power outages frustrate residents
Bulawayo: Power outages frustrate residents
DATE: 2013/07/24::
6
how much does a grinding mill cost in zimbabwe
how much does a grinding mill cost in zimbabwe
DATE: 2014/01/22::
7
Madzitateguru - ZESA
Madzitateguru - ZESA
DATE: 2015/01/24::
8
zesa tv ad
zesa tv ad
DATE: 2012/06/08::
9
ZESA to Explore Nuclear Options
ZESA to Explore Nuclear Options
DATE: 2013/09/10::
10
Netone Zesa Advert
Netone Zesa Advert
DATE: 2014/05/21::
11
Zambia and Zimbabwe to construct a hydropower plant at US$2.5b
Zambia and Zimbabwe to construct a hydropower plant at US$2.5b
DATE: 2015/03/30::
12
Crimea Without Electricity: Power supply cut off in Russian-occupied Ukrainian penninsula
Crimea Without Electricity: Power supply cut off in Russian-occupied Ukrainian penninsula
DATE: 2014/12/24::
13
Panti
Panti's Noble Call in Zimbabwe
DATE: 2015/05/17::
14
Zimbabwe Moonlight Economy
Zimbabwe Moonlight Economy
DATE: 2014/04/15::
15
Passengers stranded at Mombasa Airport after power blackout
Passengers stranded at Mombasa Airport after power blackout
DATE: 2009/06/15::
16
thermal power plant map varanasi
thermal power plant map varanasi
DATE: 2013/11/15::
17
Solutions for Zimbabwe
Solutions for Zimbabwe's Power Sector
DATE: 2011/03/03::
18
Eco house build 9: electricity supply
Eco house build 9: electricity supply
DATE: 2014/02/18::
19
China: Soft Power or Hard Sell? - The Listening Post (Full)
China: Soft Power or Hard Sell? - The Listening Post (Full)
DATE: 2012/05/19::
20
Upcoming projects in construction industry in Africa: News
Upcoming projects in construction industry in Africa: News
DATE: 2014/11/18::
21
U.S. DOLLAR COLLAPSE - Dont Buy GOLD or SILVER instead BUY ZIMBABWE DOLLAR Now (Comedy Sketch)
U.S. DOLLAR COLLAPSE - Dont Buy GOLD or SILVER instead BUY ZIMBABWE DOLLAR Now (Comedy Sketch)
DATE: 2014/05/28::
22
buy a compressor in zimbabwe
buy a compressor in zimbabwe
DATE: 2013/12/23::
23
Westgate shopping Mall Harare Zimbabwe
Westgate shopping Mall Harare Zimbabwe
DATE: 2013/05/04::
24
Contaminated Water Supply on 24 May 2014 in Blk 290B Compassvale Cres, Sengkang, Singapore
Contaminated Water Supply on 24 May 2014 in Blk 290B Compassvale Cres, Sengkang, Singapore
DATE: 2014/05/23::
25
Lighting World
Lighting World
DATE: 2014/09/18::
26
TIME TO GO HOME ZIMBABWEANS FROM DIASPORA?
TIME TO GO HOME ZIMBABWEANS FROM DIASPORA?
DATE: 2013/11/27::
27
power station coal crusher
power station coal crusher
DATE: 2015/04/09::
28
coal crusher plant for power generation
coal crusher plant for power generation
DATE: 2015/04/03::
29
is grinding coal to power physical
is grinding coal to power physical
DATE: 2013/10/17::
30
Changing Our World #75: "The Passion of Zimbabwe"
Changing Our World #75: "The Passion of Zimbabwe"
DATE: 2014/07/08::
31
Zimbabwe Women
Zimbabwe Women's Bureau: A Home Away from Home
DATE: 2013/08/19::
32
PERMISSION FOR STONE CRUSHER ODISHA
PERMISSION FOR STONE CRUSHER ODISHA
DATE: 2015/05/10::
33
Fluoride Safety Results Rigged by UK Health Authorities
Fluoride Safety Results Rigged by UK Health Authorities
DATE: 2013/01/26::
34
Zimbabwean Men: Best Lingerie Shoppers?
Zimbabwean Men: Best Lingerie Shoppers?
DATE: 2013/07/15::
35
specs on an 866 jaw crusher
specs on an 866 jaw crusher
DATE: 2015/04/24::
36
power stone crusher
power stone crusher
DATE: 2015/05/07::
37
Strategy of Survival in Zimbabwe.wmv
Strategy of Survival in Zimbabwe.wmv
DATE: 2012/01/14::
38
Who would suffer more if the gas taps were turned off? Russia or Europe?
Who would suffer more if the gas taps were turned off? Russia or Europe?
DATE: 2014/06/02::
39
GEM SMALL AND MINI DRYER FOR GREEN TEA MACHINERY, ORTHODOX TEA MACHINERY AND CTC TEA MACHINERY
GEM SMALL AND MINI DRYER FOR GREEN TEA MACHINERY, ORTHODOX TEA MACHINERY AND CTC TEA MACHINERY
DATE: 2014/03/05::
40
cone crusher shaker
cone crusher shaker
DATE: 2015/05/07::
41
Tapestries of Hope
Tapestries of Hope
DATE: 2009/12/14::
42
largest crusher plant in delhi
largest crusher plant in delhi
DATE: 2013/10/16::
43
crushing types of crushers
crushing types of crushers
DATE: 2015/05/07::
44
stone crusher sargodha
stone crusher sargodha
DATE: 2015/05/07::
45
mining degrees through unisa
mining degrees through unisa
DATE: 2014/02/14::
46
jc jaw crusher
jc jaw crusher
DATE: 2015/05/10::
47
second hand mining equipment for sale south africa
second hand mining equipment for sale south africa
DATE: 2014/01/14::
48
electrical machinery for a cement plant
electrical machinery for a cement plant
DATE: 2014/02/19::
49
screening equipment for ag lime
screening equipment for ag lime
DATE: 2014/04/16::
50
Water Main Break Kills Child, Floods Neighbourhood in Rio de Janeiro
Water Main Break Kills Child, Floods Neighbourhood in Rio de Janeiro
DATE: 2013/07/31::
NEXT >>
RESULTS [51 .. 101]
From Wikipedia, the free encyclopedia
Jump to: navigation, search
ZESA
Public utility
Industry Energy industry
Headquarters Zimbabwe
Services Electricity
Website www.zesa.co.zw

Zimbabwe Electricity Supply Authority, (ZESA) officially called ZESA Holdings (Pvt) LTD., is a state-owned company whose task is to generate, transmit, and distribute electricity in Zimbabwe. It has organized this task by delegation to its subsidiaries, the energy generating company Zimbabwe Power Company (ZPC) and the Zimbabwe Electricity Transmission and Distribution Company (ZETDC). Other subsidiaries are investment branch ZESA Enterprises (ZENT) and internet provider PowerTel Communications (Pvt) ltd. ZESA is the only electricity generator and supplier for the public grid. For many years the company has failed to produce enough energy to meet demands. ZESA produced an estimated 8.89 bill kWh in 2007, while demand was estimated to 10.89 kWh.[1] ZESA represents Zimbabwe in the Southern African Power Pool.

Current situation[edit]

In general the power generation capacity in Zimbabwe is too small to meet demand from the industry and private householdings. Import of electricity from surrounding countries has eased the situation somewhat, but load shedding is used on a routine basis and some rural areas do not have electricity over long periods. Zimbabwe’s difficult economic situation causes part of the problems, as coal for power stations may at times not be produced in sufficient amounts. On the other hand, the economy is hampered by the unforeseeable energy situation. Recently the revival of the economy has increase demand.

Situation for the power stations[edit]

ZESA owns the Kariba Power Station together with its Zambian counterpart, ZESCO. The station is part of the Kariba Dam project, damming the Zambezi river. The Zimbawean-owned capacity is said to be around 750 MW. ZESA also owns four thermal power stations, of which Hwange Thermal Power Station in the extreme west of the country is by far the largest with a theoretical capacity of about 920 MW. The other three at Harare, Bulawayo and Munyati have a nominal capacity of 270 MW together. In the last years the thermal power stations have only been producing part or no electricity due to coal shortages and maintenance neglect. Botswana Power Corporation (BPC) and Namibias NamPower have in 2009 made agreements to help ZESA to revive the capacity in exchange for power deliveries.[2] Work on Hwange has led to a better situation and the three minor stations are scheduled to be revived in the first quarter of 2011.[3]

ZESA power stations[edit]

Projected stations[edit]

Besides plans to upgrade both the Hwange plant and the Kariba dam facility, two new plants are projected, however funding is not secured.

External links[edit]

See also[edit]

References[edit]

Wikipedia content is licensed under the GFDL License
Powered by YouTube
MASHPEDIA
LEGAL
  • Mashpedia © 2015